You can use the “Export to Excel” or “Print to HTML” features. You can even set filters on each column to help your analysis. The reports are shown in different tabs where the user can switch from one report to another. First, simply browse and select your base and revised XER files, then click the “Import Schedules” button.Ĭhoose the report you want to see from the list on the left of the screen, then click the Create Reports button.Ĭhange Inspector’s output is simple. Loading up 2 Primavera P6 XER files is the first step in generating comparison reports. Step 1 – Load and Compare two Primavera P6 XER files With Change Inspector, in 3 easy steps, a detailed schedule comparison report can be created.

PRIMAVERA P3 HELP UPDATE

It also highlights the problem areas, like the activities that were supposed to start in the update period but didn’t.Change Inspector provides the schedule comparison results in a series of comprehensive and organized reports. Posted in Change Inspector FAQ, Forensic Delay Analysis, Oracle Primavera P6 Comparing XER Files with Change InspectorĬhange Inspector improves the schedule review process and reduces the review time. Change Inspector saves you time and money.

PRIMAVERA P3 HELP TRIAL

You can download a 30 day trial version of Change Inspector (  ) and experience the benefits firsthand. These are only a few examples of Change Inspector’s benefits. As an added bonus, Change Inspector can also compare MS Project files. To run Claim Digger, users need to have a P6 license. Change Inspector does not need to have P6 installed. It is not possible to see the effects of the added activities in one streamlined report.Ĭhange Inspector produces additional reports such project dashboard.Ĭhange Inspector works with XER files or can directly connect to the Primavera database. It is important to see the added activities with their duration and float values on one report so that the scheduler can easily check if the activities were added to the critical path.Ĭlaim Digger only shows the added activities. As a result, in the Claim Digger report, it is not possible to tell whether the duration changes result in negative float. Furthermore, the scheduler cannot see the float values on the same report. On the other hand, Claim Digger shows this information in 2 separate sections. For example, duration changes and description changes should be summarized in one report because both a description and original duration change may indicate an activity scope change. Change Inspector creates streamlined reports. The schedule review and documentation of the changes require a streamlined approach. Not only that it is easier to review and navigate, it is also easier to create and format custom reports.Ĭlaim Digger reports are difficult to use without clean up and reformatting. On the other hand, Change Inspector creates reports in Excel format organized by worksheets. The scheduler has to scroll up and down through hundreds of pages. Navigating the Claim Digger reports can be cumbersome and time consuming. Change Inspector is a schedule comparison tool that addresses these short-comings.Ĭlaim digger produces a lengthy HTML report that could be hundreds of pages long. The Scheduler Comparison in the same location (Tools) as Claim Digger but clicking on it will launch the Visualizer program.Ĭlaim Digger has its shortcomings. April, 2016 – P6 Version 16.1.0 Schedule Comparison (Claim Digger) is available in P6 Visualizer.SQLite version does not support Claim Digger.

PRIMAVERA P3 HELP PATCH

  • October, 2014 – P6 Release 8.4 Patch Set 1 (8.4.1) P6 Pro stand-alone now installs SQLite database manager instead of the server options.
  • April, 2013 – P6 Pro and EPPM Version 8.3 added Visualizer tool.
  • 2008 – Claim Digger for P3 is no longer available for sale.
  • primavera p3 help

    PRIMAVERA P3 HELP SOFTWARE

  • 2004 – P3 e/c is renamed to P3 Engineering & Construction (Version 4.0 and 4.1) and Claim Digger was first added to the software as a java application.
  • A brief timeline of Claim Digger is as follows: Claim digger was acquired by Primavera and subsequently became part of Oracle Primavera P6. Claim Digger used to be the “go-to” third-party software for comparing Primavera P3 files.

    PRIMAVERA P3 HELP FULL

    It serves to document the basis of the delay analysis as well as being a full auditable record of the project schedule. A schedule comparison report can be created as a part of the routine monthly report and serves multiple purposes. It is important to create a schedule comparison report with every change and schedule update to identify the impacts. Additional work and change orders can result in delays to the project.